llyrafantasyfae: (Default)
[personal profile] llyrafantasyfae
School has started for me and I already have papers and the such due so, in an attempt to stay on track I have made a to do list. My main sewing days will be Friday-Sunday after the homework is done of course. Behind the cut so I don't crowd up people's pages who are not as interested.
*List has been edited*

- Map out on Yellow Silk the Forepart and Strips
  - Measure Forepart width
  - Adjust Didi to my height at waist to floor
  - Hem and cut down underskirt's length
  - Mark/draw bodice trim on the interlining
    - Measure trim drawing for strip length
- Begin work on sleeves
  -Make another mock up of the sleeve to pin pieces to after they have been cut out
    - Number each panel
  - Cut current mock up into strips for pattern pieces
    - Number strips as uncut mock up is numbered
  - Cut out all the yellow silk lining pieces
  - Wash the trim fabric
  - Cut sleeve peices that are made from the trim fabric
  - Make the sleeve peices that I can
  - Plot out the embelishment placement
- Order more muslin for overcoat mock up

There is more of course but that list is plenty long enough. When I have crossed out the majority of them I will add the extras.

Date: 2007-08-23 12:10 pm (UTC)
From: [identity profile] aviendiora.livejournal.com
A to-do list is always good. If you don't feel like doing one thing, you can just look at the list and pick another thing to do. At least in theory. =) Good luck!

Profile

llyrafantasyfae: (Default)
llyrafantasyfae

December 2018

S M T W T F S
      1
2345678
9101112131415
16171819202122
23242526272829
3031     

Most Popular Tags

Style Credit

Expand Cut Tags

No cut tags
Page generated Jan. 25th, 2026 11:52 am
Powered by Dreamwidth Studios